






 | |
GEM WATER INC.
SCHEDULE OF RATES AND CHARGES
|
|
Effective
Date: 9/23/07
|
|
|
|
|
Applicable
Monthly Base charge:
|
| Size
of Meter |
Monthly
Charge
|
|
5/8
|
$15.00
|
|
Ύ
|
$15.00
|
|
1
|
$20.00
|
|
Plus: Commodity
Charge based on the Gallons of Water Consumed Monthly:
$4.73 per 1000 Gallons |
|
Applicable
Monthly Base charge:
|
| Size
of Meter |
Monthly
Charge
|
|
5/8
|
$12.50
|
|
Ύ
|
$12.50
|
|
1
|
$20.00
|
|
Plus: Commodity
Charge based on the Gallons of Water Consumed Monthly:
$4.73 per 1000 Gallons |
|
Applicable
Monthly Base charge:
|
| Size
of Meter |
Monthly
Charge
|
|
5/8
|
$10.00
|
|
Ύ
|
$10.00
|
|
1
|
$20.00
|
|
Plus: Commodity
Charge based on the Gallons of Water Consumed Monthly:
$4.73 per 1000 Gallons |
|
|
|
Applicable
Monthly Base charge per unit
|
| Size
of Meter |
Monthly
Charge
|
|
5/8
|
$7.50
|
|
Ύ
|
$7.50
|
|
1
|
$7.50
|
|
1-1/2
|
$7.50
|
|
2
|
$7.50
|
|
3
|
$7.50
|
|
4
|
$7.50
|
|
6
|
$7.50
|
|
Plus: Commodity
Charge based on the Gallons of Water Consumed Monthly:
$4.73 per 1000 Gallons |
|
|
|
|
Applicable
Monthly Base charge
|
| Size
of Meter |
Monthly
Charge
|
|
5/8
|
$15.00
|
|
Ύ
|
$15.00
|
|
1
|
$40.00
|
|
1-1/2
|
$100.00
|
|
2
|
$140.00
|
|
3
|
$165.00
|
|
4
|
$195.00
|
|
6
|
$250.00
|
|
Plus: Commodity
Charge based on the Gallons of Water Consumed Monthly:
$4.73 per 1000 Gallons |
|
Billing Period:
Is approximately 30 days from meter reading to meter reading.
|
|
|
|
|
|
Initial Connection with
company
|
Installed pits (per lot) |
With Fireflows
|
|
|
|
|
|
5/8
|
$800.00
|
|
|
Ύ
|
|
|
|
1
|
$1,100.00
|
|
|
1-1/2
|
$1,500.00
|
|
|
2
|
$3,500.00
|
|
|
3
|
$4,000.00
|
|
|
4
|
$6,500.00
|
$11,300
|
|
6
|
$8,900.00
|
$12,500
|
|
8
|
-----------
|
$16,150
|
|
|
|
|
|
Service Charges:
|
|
|
|
|
|
Reinstallation of Meter (at customers request)
|
|
|
Reconnection fee (after non-payment)
|
$30.00
|
|
Reconnection fee Overtime
|
$45.00
|
|
NSF Checks
|
$17.00
|
|
Bulk Water Hook on Fee (per 30 days)
|
$50.00
|
|
Bulk Water Charge
|
$6.00 per 1000 Gal.
|
|
Bulk Water Meter Deposit
|
$200.00
|
|
Second Test of Meter within 36 months
|
Actual costs incurred
|
|
Penalty Charge for Tampering with Company meter
|
$50.00 + repair costs
|
|
|
|
|
Partial EDU Equavalency Table:
|
|
|
Single Family
|
1 EDU
|
|
2 Family Per Unit
|
.85 EDU
|
|
3 & 4 Family Per Unit
|
.8 EDU
|
|
Apartments
|
.7 EDU
|
|
|
|
|
Water Main Extensions for Development:
|
|
|
|
|
|
The rules for Main Extensions are long and
complicated, and are therefore omitted from this schedule. For information concerning such extension, please contact
the company directly.
|
|